X

PRODUCTS

Electric hoists represent their own machinery, strength, and toughness, while the stage is elegant, flowing, and soft, with conflicts and collisions between the two.

Reliable Stage Rigging Hoist

Time:2025-09-15

Brief Explanation :

The reliable stage rigging hoist takes flexible adaptation to on-site environments as its core advantage. In terms of power supply, it supports direct connection to civil circuits via 220V single-phas

Category : W12 Stage Electric Hoist

Get a Quote

Product Details

In terms of load-bearing performance, the reliable stage rigging hoist has a coverage range of 50-500 kilograms, which precisely meets the needs of small and medium-sized events: It can easily hoist light equipment such as par lights and small projectors, with a hook opening of 45mm, which is compatible with most standard lifting rings; The 100-300 kg model adopts a double guide chain design, with a chain diameter of 6mm and made of high-strength alloy steel. The breaking force is more than 5 times the bearing capacity, which is suitable for scenarios such as truss splicing and backdrop hanging; The 500 kg model is equipped with a reinforced gear set with a reduction ratio of 1:20, which can handle the transportation of heavier equipment such as small LED screens and subwoofers.
Compared with large lifting machinery, its compact body design allows it to move quickly through rails. The rail adaptation width ranges from 100mm to 300mm, enabling it to move flexibly in venues with a floor height of 3-8 meters, with a minimum turning radius of only 800mm. The reliable stage rigging hoist is especially suitable for space-limited scenarios such as wedding venues and corporate annual meetings.
Compared with manual handling, it not only reduces the single-person load from dozens of kilograms to zero, but also is equipped with a built-in overload protection device. When the load exceeds 10% of the rated value, it will automatically cut off the power supply and issue a beep alarm at the same time, eliminating the risk of equipment falling due to overweight. According to actual tests, in the scene of building a 200-square-meter stage, the use of the reliable stage rigging hoist can increase the installation efficiency by 3-5 times, shortening the time from 4 hours of traditional manual work to within 1.5 hours, and it has become an indispensable core auxiliary equipment in the whole process from construction to removal of small and medium-sized events.

RELATED PRODUCTS .

RELATED NEWS .

Copyright © 2023 Tianjin Kemei Machinery Manufacturing Co., Ltd