X

PRODUCTS

Electric hoists represent their own machinery, strength, and toughness, while the stage is elegant, flowing, and soft, with conflicts and collisions between the two.

1 Ton Stage Truss Hoist

Time:2025-12-23

Brief Explanation :

A 1-ton stage truss hoist is a specialized light lifting equipment designed exclusively for stage scenarios, with a rated lifting capacity of 1 ton (1000 kilograms). Its core functions are the precise

Category : W12 Stage Electric Hoist

Get a Quote

Product Details

The Grade G80 lifting chain fitted to the 1 ton stage truss hoist delivers exceptional material workmanship and mechanical performance. It meets the industry’s stringent high standards across core performance metrics including tensile strength, wear resistance and impact toughness, and is fully suited to the high-frequency, variable-load hoisting demands of stage performances. That said, throughout the entire service life of the stage hoist, standardized operating procedures and regular inspection and maintenance remain the key to establishing a robust safety barrier for the equipment.

Personnel must strictly adhere to the safety operation guidelines for the 1 ton stage truss hoist during operation, accurately control the hoisting weight, and strictly prohibit unsafe practices such as overloading, oblique lifting, and abrupt start/stop operations. These measures are designed to prevent irreversible plastic deformation, chain link wear or fatigue damage to the Grade G80 chain caused by such improper operations. Meanwhile, a comprehensive equipment maintenance management system covering daily inspection, regular special testing and annual in-depth maintenance must be established. Detailed inspections should be conducted on critical components of the Grade G80 chain, such as the wear level of chain links, the loosening condition of pin shafts, the corrosion status of the chain, and the meshing precision between the chain and the hoist sprocket. In the event that potential hazards are identified—such as cracks, deformation or excessive wear on the chain of the 1 ton stage truss hoist—the equipment must be shut down immediately for remediation, and damaged parts should be replaced in a timely manner. This ensures that the lifting system, which consists of the chain, hoist main unit, hook and limit device, is always maintained in a safe and reliable operational condition.

RELATED PRODUCTS .

RELATED NEWS .

Copyright © 2023 Tianjin Kemei Machinery Manufacturing Co., Ltd